Mats is a PMP, (Project Management Professional) with more than 15 years of experience from project management in different lines of businesses.
One of Mats greatest skills is his ability to manage projects by using his expertise of the generic base of project management in different areas.
As a structured and goal oriented project manager Mats focuses on performing excellent work with the right scope, time and costs for the customer.
Mats holds a Master of Science in Engineering Physics, Computer Technology from Uppsala University.
During spare time Mats enjoys practising running and cross country skiing.
EXPERIENCE AREAS
|
Business knowledge |
Pharmaceutical, Medical Device, Telecom, Computer Technology, Power Distribution and Production, Municipality |
|
Project Management |
Project Management Professional (PMP®) since January 1, 1999. PMBOK, PROPS, SMASH |
|
Validation |
GMP and GAMP |
|
Quality Systems and Standards |
ISO 9000, Six Sigma, GMP, ISO 13485:2003 |
|
Computer Technology |
Hardware: PC, Mac and Mini Computers Operating Systems: UNIX, Linux, MS Windows 2000, NT, XP, ME, 98and 95, Mac OS, Mac OS X and MS DOS Programming Languages: Fortran, Pascal, Basic and Unix ShellScripts Data bases: Oracle, MySQL, Mimer Data Communication: Apple Talk, TCP/IP, Samba and NFS Software: MS Office, MS Project, Pro Chain, AutoCad, System 9(GIS), X11 emulation |
ASSIGNMENTS FOR TRANSMEDEQ
Ongoing Transmedeq
AstraZenca
2011-04-27-->
Project Management of Pressure and Vision IN06
Lioness Therapeutics AB
2010-02-05-->
Project Management and Quality Management
Closed
Pfizer Health AB
2011-03-11-2011-03-28
Project Management Utility
The project was terminated
Sandvik Materials Technology
2009-12-17 --2011-02-17
Project management of a feasibility study for a new test lab for destructive testing of pipes.
Project management of the procurement, installation and commissioning of a scanning electron microscope and the construction of this room.
Project management of construction of a temporary test lab.
Oncolog Medical QA AB
2007-02-26-2009-05-20
Project Management support for Oncolog.
Project Manager for Röde Orm project. That is the development of a new Patient Logistic System for Proton Therapy.
Project Support Scandinavian Cancer Care AB
2007-10-22 - 2008-06-01
To develop the project model
Project management of the technical part of the Turn Key Radio Therapy Clinic
Sponsor Relay for Upsala IF Athletics
2007
ASSIGNMENTS FOR SEMCON
|
2007 |
EAB/AZA 2006-10-05-- 2007-01-31
Project Manager for implementation of iPROPS. Also included are implementation of result. Acting as second teacher for iPROPS for Project Managers.
There are 15 people in the project group and about 8 people in the steering group. The implementation is covering site Älvsjö. |
|
2007 |
Polismyndigheten i Stockholm 2007-02-13--15 and 2007-03-13--15
Training-PROPS for Project Manager Acting as second teacher. 25 attendes on course. |
|
2007 |
SL- Storstockholms lokaltrafik 2007-01-25
Acting as process leader for a Workshop covering Stakeholder Analysis. Training in introduction to PROPS |
|
2006 |
Ericsson Power Modules 2006-04-07--2006-10-13
Project Manager for development of a custom solution for a Power Module. |
|
2006 |
SL- Storstockholms lokaltrafik 2006-11
Acting as process leader for a TG3 Workshop covering Roles and Responsibilities and a Risk Analysis |
|
2006 |
Polismyndigheten i Stockholm 2006-09-26--28
Training-PROPS for Project Manager Acting as second teacher. 25 attendes on course. |
|
2005-2006 |
AstraZeneca Snäckviken Södertälje
Project Manager for a project that aims to change the operating systems on several computer based robot systems on Quality Control Lab Turbuhaler AstraZeneca Södertälje The scope of the project is to replace Windows NT with Windows 2000 on approximately 30 robot systems. It involves managing and coordination of activities performed by consultants, AstraZeneca personnel and IBM, who handles the infrastructure at AstraZeneca. Totally 11 persons. The project is planned to end in late December. |
|
2005 |
AstraZeneca Snäckviken Södertälje
Development and execution of training in back up with Norton Ghost 9 on networking computers. The training is executed on two pre installed computers with Norton Ghost 9, Nero 6 and CD-roller. The training is executed during one day. |
>
|
2005 |
AstraZeneca Snäckviken Södertälje
FeasibilityStudy and preparation of a Project Plan for a change of operating systems on several computer based robot systems on Quality Control Lab Turbuhaler AstraZeneca Södertälje. |
|
2004-2005 |
Pfizer Site Hornsberg Stockholm
Sub Project Manager for Process Utilities
Project Management of Preliminary and Detailed Design regarding rebuild ing of WFI, Clean Steam, Hydrogen and Pressured air at the Site Hornsberg |
|
2003-2004 |
Pfizer Syringe Center Uppsala ;
Project Manager for a subproject regarding formulation, filling machines, freeze dryers, autoclaves, washing machines, inspection and assembly. Deliveries were IQ, OQ and PQ reports. |
|
2002-2003 |
Pharmacia Syringe Center Uppsala
Different positions: Project Manager for a subproject regarding formulation and autoclaves. Deliveries were IQ, OQ and PQ reports.
Time and production controller for the site. Deputy Project Manager. |
|
2002 |
Pharmacia Site Fyrislund (AMO)
Subproject Manager for Computer validation of a Yokogawa printer. |
|
2002 |
Mercodia AB Uppsala
Executed a Prestudy for a new production and store system.
The study included an analysis of present state, an URS and an action plan. |
|
2000-2002 |
Biacore AB Uppsala
Different positions: Project Manager for a development of a new optical interface for an instrument. People with competence in optics, physics, micro mechanics and chemical were involved.
Project manager for subproject for a prototype construction of a biosensor instrument based on SPR (Surface Plasmon Resonance). People with competence in soft ware programming, electronics, optics, physics, micro mechanics and chemical were involved. |
|
1998-2000 |
Ericsson Radio Systems AB Mobile Telephone Systems Sundbyberg/Kista
Subproject Manager for CPI (Customer Product Information) regarding GSM Radio Base Station. The aim for the subproject was to update and produce manuals for installation, service and spare parts with assistance of writers, illustrators, method engineers and configurations managers. |
|
1998 |
XEROX AB Stockholm
Project Manager for a pilot installation of a new version of support system for sales personnel. The work included documentation, testing and system administration. |
OTHER EMPLOYMENTS AND ASSIGNMENTS
|
1988-1998 |
UPPSALA ENERGI AB Uppsala
Different positions: Project Manager for a new documentation system. Computer Manager for 8 persons. Responsible for purchasing, project management and personel. Computer Engineer Responsible for Administrative Computerized Systems Planning Engineer for the electricity unit |
|
1984-1988 |
SCANDITRONIX AB Uppsala
Programming, construction and testing of electronical and mechanical components. The employment started at Therados and was later transformed to Scanditronix. |
LANGUAGES
|
English |
Good communicating skills on a social- and professional level, verbally and in written. |
EDUCATION
Higher and basic studies
|
1978-2001 |
Stand alone courses at Uppsala University 1978-1979 Computer technology AB 40 p 1983 Introduction to Jurisprudence 10 p 1984 Law of trading I 10 p 1984 English, orally and written for economists, 5 p 1985 Organization 5 p 1985 Basic controlling of economy 5 p 1988 National economy base course A 20 p |
|
lign="top">
1979-1984 |
Master of Science Master of Science in Engineering Physics, Computer Technology Uppsala University, 160 p |
Corporate training
|
1996-2004 |
Project Management and leadership 2006 Project planning in Props 2006 Props for Project Managers 2004-04-22--23 Project Quality and Six Sigma Management Method 2003-05-13--15 Props for Project Managers Semcon 1998-1999 Project Manager training, 25 days, Semcon 1996 Leadership through personal development 3 weeks IFL