Curriculum vitae

 

Mats R. G. Andersson, PMP

Senior Project Manager

 

PRESENTATION

Mats is a PMP, (Project Management Professional) with more than 15 years of experience from project management in different lines of businesses. 

One of Mats greatest skills is his ability to manage projects by using his expertise of the generic base of project management in different areas. 

As a structured and goal oriented project manager Mats focuses on performing excellent work with the right scope, time and costs for the customer. 

Mats holds a Master of Science in Engineering Physics, Computer Technology from Uppsala University. 

During spare time Mats enjoys practising running and cross country skiing. 

 

EXPERIENCE AREAS

Business knowledge

Pharmaceutical, Medical Device, Telecom, Computer Technology, Power Distribution and Production, Municipality

Project Management

Project Management Professional (PMP®) since January 1, 1999. 

PMBOK, PROPS, SMASH

Validation

GMP and GAMP

Quality Systems and Standards

ISO 9000, Six Sigma, GMP, ISO 13485:2003

Computer Technology

Hardware: PC, Mac and Mini Computers 

Operating Systems: UNIX, Linux, MS Windows 2000, NT, XP, ME, 98and 95, Mac OS, Mac OS X and MS DOS  

Programming Languages: Fortran, Pascal, Basic and Unix ShellScripts 

Data bases: Oracle, MySQL, Mimer  

Data Communication: Apple Talk, TCP/IP, Samba and NFS 

Software: MS Office, MS Project, Pro Chain, AutoCad, System 9(GIS),  

X11 emulation

 

ASSIGNMENTS FOR TRANSMEDEQ

Ongoing Transmedeq

AstraZenca

2011-04-27--> 

Project Management of Pressure and Vision IN06

 

 

 

 

 

Lioness Therapeutics AB

2010-02-05-->

Project Management and Quality Management

Closed 

Pfizer Health AB

2011-03-11-2011-03-28

Project Management Utility 
The project was terminated 

 

Sandvik Materials Technology

2009-12-17 --2011-02-17

Project management of a feasibility study for a new test lab for destructive testing of pipes.

Project management of the procurement, installation and commissioning of a scanning electron microscope and the construction of this room.

Project management of construction of a temporary test lab.


 

 Oncolog Medical QA AB
2007-02-26-2009-05-20

Project Management support for Oncolog.
Project Manager for Röde Orm project. That is the development of a new Patient Logistic System for Proton Therapy.

 

Project Support Scandinavian Cancer Care AB 
2007-10-22 - 2008-06-01 

To develop the project model 
Project management of the technical part of the Turn Key Radio Therapy Clinic 

Sponsor Relay for Upsala IF Athletics 
2007

ASSIGNMENTS FOR SEMCON

2007

EAB/AZA 

2006-10-05-- 2007-01-31

 

Project Manager for implementation of iPROPS. 

Also included are implementation of result. 

Acting as second teacher for iPROPS for Project Managers. 

 

There are 15 people in the project group and about 8 people in the steering group. 

The implementation is covering site Älvsjö.

 

2007

Polismyndigheten i Stockholm 

2007-02-13--15 and 2007-03-13--15 

 

Training-PROPS for Project Manager 

Acting as second teacher. 

25 attendes on course.

2007

SL- Storstockholms lokaltrafik 

2007-01-25

 

Acting as process leader for a Workshop covering Stakeholder Analysis.

Training in introduction to PROPS

 

2006

Ericsson Power Modules 

2006-04-07--2006-10-13 

 

Project Manager for development of a custom solution for a Power Module.

 

2006

SL- Storstockholms lokaltrafik 

2006-11 

 

Acting as process leader for a TG3 Workshop covering Roles and Responsibilities and a Risk Analysis

 

2006

Polismyndigheten i Stockholm 

2006-09-26--28 

 

Training-PROPS for Project Manager 

Acting as second teacher. 

25 attendes on course.

 

 

 

2005-2006

AstraZeneca Snäckviken Södertälje 

 

Project Manager for a project that aims to change the operating systems on several computer based robot systems on Quality Control Lab Turbuhaler AstraZeneca Södertälje 

The scope of the project is to replace Windows NT with Windows 2000 on approximately 30 robot systems. It involves managing and coordination of activities performed by consultants, AstraZeneca personnel and IBM, who handles the infrastructure at AstraZeneca. Totally 11 persons. 

The project is planned to end in late December.

 

2005

AstraZeneca Snäckviken Södertälje 

 

Development and execution of training in back up with Norton Ghost 9 on networking computers. 

The training is executed on two pre installed computers with Norton Ghost 9, Nero 6 and CD-roller. The training is executed during one day.

 

>

2005

AstraZeneca Snäckviken Södertälje 

 

FeasibilityStudy and preparation of a Project Plan for a change of operating systems on several computer based robot systems on Quality Control Lab Turbuhaler AstraZeneca Södertälje.

 

2004-2005

Pfizer Site Hornsberg Stockholm 

 

Sub Project Manager for Process Utilities 

 

Project Management of Preliminary and Detailed Design regarding rebuild ing of WFI, Clean Steam, Hydrogen and Pressured air at the Site Hornsberg

 

2003-2004

Pfizer Syringe Center Uppsala  ;

 

Project Manager for a subproject regarding formulation, filling machines, freeze dryers, autoclaves, washing machines, inspection and assembly. 

Deliveries were IQ, OQ and PQ reports.

2002-2003

Pharmacia Syringe Center Uppsala 

 

Different positions: 

Project Manager for a subproject regarding formulation and autoclaves. 

Deliveries were IQ, OQ and PQ reports. 

 

Time and production controller for the site. 

Deputy Project Manager.

 

2002

Pharmacia Site Fyrislund (AMO) 

 

Subproject Manager for Computer validation of a Yokogawa printer.

 

2002

Mercodia AB Uppsala 

 

Executed a Prestudy for a new production and store system. 

 

The study included an analysis of present state, an URS and an action plan.

 

2000-2002

Biacore AB Uppsala 

 

Different positions: 

Project Manager for a development of a new optical interface for an instrument. 

People with competence in optics, physics, micro mechanics and chemical were involved. 

 

Project manager for subproject for a prototype construction of a biosensor instrument based on SPR (Surface Plasmon Resonance). People with competence in soft ware programming, electronics, optics, physics, micro mechanics and chemical were involved.

 

1998-2000

Ericsson Radio Systems AB Mobile Telephone Systems Sundbyberg/Kista 

 

Subproject Manager for CPI (Customer Product Information) regarding GSM Radio Base Station. 

The aim for the subproject was to update and produce manuals for installation, service and spare parts with assistance of writers, illustrators, method engineers and configurations managers.

 

1998

XEROX AB Stockholm 

 

Project Manager for a pilot installation of a new version of support system for sales personnel. 

The work included documentation, testing and system administration.

 

OTHER EMPLOYMENTS AND ASSIGNMENTS

1988-1998

UPPSALA ENERGI AB Uppsala 

 

Different positions: 

Project Manager for a new documentation system. 

Computer Manager for 8 persons. 

Responsible for purchasing, project management and personel. 

Computer Engineer 

Responsible for Administrative Computerized Systems 

Planning Engineer for the electricity unit

 

1984-1988

SCANDITRONIX AB Uppsala 

 

Programming, construction and testing of 

electronical and mechanical components. 

The employment started at Therados and was later transformed to Scanditronix.

 

LANGUAGES

English

 Good communicating skills on a social- and professional level, verbally and in written.

EDUCATION

Higher and basic studies

1978-2001

Stand alone courses at Uppsala University 

1978-1979 Computer technology AB 40 p 

1983 Introduction to Jurisprudence 10 p 

1984 Law of trading I 10 p 

1984 English, orally and written for economists, 5 p 

1985 Organization 5 p 

1985 Basic controlling of economy 5 p 

1988 National economy base course A 20 p

lign="top">

1979-1984

Master of Science   

Master of Science in Engineering Physics, Computer Technology 

Uppsala University, 160 p

 

Corporate training

1996-2004

Project Management and leadership

2006 Project planning in Props

2006 Props for Project Managers 

2004-04-22--23 Project Quality and Six Sigma Management Method 

2003-05-13--15 Props for Project Managers Semcon 

1998-1999 Project Manager training, 25 days, Semcon 

1996 Leadership through personal development 3 weeks IFL 

 

GMP 

2005: 2 days Risk analysis Lundén/Ellow 

2004: GMP 1 day repetition Lundén/Ellow 

2003: GMP 1 day repetition Lundén/Ellow 

2002: GMP 1 day repetition Pharmacon Quality Group 

2001: GMP 1 day course Pharmacon Quality Group 

Certified computer validation leader 5 days Pharmacon Quality Group